
Warranty requests that owners send and follow on their own
The owner reports a problem from the unit’s manual, with photos, and follows it on a private page. Each request becomes a numbered card on the project’s board, with the system, the warranty and the company that answers.
- Reported from the owner’s manual
- A numbered card on the board
- In warranty or out, worked out for you
The problem it solves
After handover, warranty calls arrive by phone, email and messages, often with no photo or unit number. They get lost between the office and the subcontractor, the owner keeps calling for news, and nobody can say how long answers take.
What it does
Reported from the owner’s manual
The owner says what is wrong, where, what it is about and which equipment, adds up to six photos and picks how to be contacted: phone call, WhatsApp or email.
A numbered card on the board
Each request becomes a WR-001 card that moves from received to under review, visit scheduled, fixed and confirmed, or not covered, like any other card of the project.
In warranty or out, worked out for you
The warranty is worked out from the handover date and the terms of the system or the equipment. Your team can change it by hand, with the reason recorded.
A private page for the owner
The owner follows each step, gets an email when it changes or a visit is booked, adds comments and confirms whether it was fixed. Internal comments on the card stay off that page.
Why it matters
Late answers in red
Each project sets how many days the team has for a first answer, two by default, and a request still waiting after that shows in red.
The right company answers
Each system in the warranty terms can name the subcontractor that answers for it, and the requests filed under that system go to them too.
See where the call-backs come from
Count requests by system and by company, see the average days to resolve and how many are in or out of warranty, and export the list to Excel.
Frequently asked questions
How does the owner open a warranty request?
From the owner’s manual opened with the unit’s QR code: they describe the problem, add photos and leave a phone number or an email so the team can answer.
Can the owner follow the progress of a request?
Yes. They keep a private link to the request, see each status and the team’s messages to them, and confirm when it was fixed or send it back.
Who receives the warranty requests?
The person you choose for the project, or the project manager by default, and the subcontractor named for that system in the warranty terms.
Tailored plans
Your proposal is built in the demo, based on the size of your operation.
More features of MotionHub Construction
- Client reportA weekly report that prepares itself with progress, time, photos and the measurement. The client opens it on the phone, asks questions and approves the measurement.
- Handover and owner’s manualEvery unit with its owner and handover date, and an owner’s manual they open from a QR code, with documents, warranties and what to look after.
- Projects on a mapEvery project on a map, in cards or in a list, with its status, phase, open tasks and documents waiting for approval.
- Project overviewOne page per project: phases and days left, what needs attention, the site, the client and the team, with every tool of the project one click away.
- Companies and contactsSubcontractors, suppliers, designers, clients and inspectors with their people, invited to each project with or without a licence, or sent documents by transmittal.
- Document registerFolders and versions per project, approval workflows, side-by-side revision comparison and transmittals with a record of who opened what.
- Document approvalsISO 19650 approval workflows and one My approvals queue with every document waiting for you, in every project, one click per step.
- Drawing registerEvery sheet with its number, title, discipline and revision, read from the title blocks of the PDFs, with the open punch items on each sheet.
- Drawing markup and commentsArrows, boxes, revision clouds, text, measures and areas to scale, and comments pinned on the drawing that the team replies to and resolves.
- 3D models and BIMIFC, GLB, STL and OBJ models opened in the browser, with sections, measures and comments, and versions and approvals like any document.
- Schedule (Gantt)A Gantt with dependencies, the critical path and a baseline. Change a duration and every date after it moves.
- Every activityEach activity says what it waits for, who does it and where, and its real progress: actual start, actual finish and percent done.
- Look-aheadThe next 2 to 6 weeks for the site meeting: what starts, what is late and who does it, as a PDF or a weekly email.
- DelaysEvery day the system checks the project’s records and suggests delays with their cause; you confirm them and see the days you can claim.
- Budget and cost reportThe budget by cost code, with subcontracts, purchase orders and bills against each line, and the forecast, variance and margin.
- Change ordersEvery change numbered, with its cost, its price to the client and the days it adds; once approved it moves the budget and the contract.
- Progress billingEach month’s measurement starts from the progress recorded on the schedule, with retention, and becomes an invoice with a due date.
- EquipmentMachines, tools and vehicles: which site each one is on, who has it, the next service and the rentals ending, with QR labels.
- Building assetsLifts, pumps, panels: every asset from purchase to handover, with what is still missing at each stage and a COBie export.
- PlacesThe project’s buildings, floors and rooms, set up once and shared by punch items, checklists, building assets and the schedule.
- Punch items and RFIsNumbered punch items, RFIs and non-conformities with photo, responsible company and due date, pinned on the plan and logged on site even without signal.
- Kinds of card and workflowsRFI, punch item, non-conformity, safety observation: each kind with its own fields, numbering and status flow, drawn as a diagram with who may take each step.
- Inspection checklistsQuality inspections, site safety inspections and material receipt checks from templates, with notes, photos and a PDF ready to sign.
- Site diaryThe daily site report with weather, crew, equipment, work done and photos, crew check-in from the phone, and a closed PDF ready to sign.
- Progress photosFixed photo points shot every week from the phone: slide through the dates of each point or compare two photos side by side.
See the solution in your company.
Guided demo and commercial terms set per company.

