
Your project budget against real costs, line by line.
Each project has its budget by cost code. Subcontracts and purchase orders count once approved, bills are charged to their line, and the cost report puts budget, committed, actual and forecast side by side.
- Budget lines by cost code
- Subcontracts and purchase orders
- Bills charged to the right line
The problem it solves
Cost overruns tend to show up when the month is closed and the bills are already paid. With the budget in one spreadsheet, the orders in another and the bills in the finance system, nobody sees a line going over while there is still time to act.
What it does
Budget lines by cost code
Type lines like a spreadsheet with unit, quantity, unit cost and unit price, grouped by cost code with subtotals, or import them from Excel.
Subcontracts and purchase orders
Commitments start as drafts against budget lines and count as committed once someone allowed to approve them does. Each one shows how much has been billed so far.
Bills charged to the right line
Add a bill here or pick one already in Finance, and charge it to a budget line and a commitment. Bills not on a line yet still show in their own row.
Forecast, variance and margin
Each line shows its forecast and its variance against budget, in red when it goes over, and the top shows the margin on the revised contract. Every number opens the records behind it.
Why it matters
See overruns while you can still act
A line turns red as soon as a commitment or a bill takes it past its budget, without waiting for the month to close.
From a red number to the bill in two clicks
Click over budget to see the lines, then the bills and orders that caused it.
Reports without rebuilding them
Download the cost report as a PDF, export the budget to Excel, or have the report emailed on a schedule to the people who follow it.
Frequently asked questions
Can I import my construction budget from Excel?
Yes. Import from Excel with the columns code, description, unit, quantity, unit cost and unit price, and export it back to Excel at any time.
What is the difference between committed and actual cost?
Committed is what you agreed with subcontractors and suppliers in approved subcontracts and purchase orders. Actual is what has been billed to the project.
Does the budget link to the schedule?
Yes. Each budget line can point at a schedule activity, and that activity’s progress suggests what to measure when you bill the client.
Tailored plans
Your proposal is built in the demo, based on the size of your operation.
More features of MotionHub Construction
- Change ordersEvery change numbered, with its cost, its price to the client and the days it adds; once approved it moves the budget and the contract.
- Progress billingEach month’s measurement starts from the progress recorded on the schedule, with retention, and becomes an invoice with a due date.
- Projects on a mapEvery project on a map, in cards or in a list, with its status, phase, open tasks and documents waiting for approval.
- Project overviewOne page per project: phases and days left, what needs attention, the site, the client and the team, with every tool of the project one click away.
- Companies and contactsSubcontractors, suppliers, designers, clients and inspectors with their people, invited to each project with or without a licence, or sent documents by transmittal.
- Document registerFolders and versions per project, approval workflows, side-by-side revision comparison and transmittals with a record of who opened what.
- Document approvalsISO 19650 approval workflows and one My approvals queue with every document waiting for you, in every project, one click per step.
- Drawing registerEvery sheet with its number, title, discipline and revision, read from the title blocks of the PDFs, with the open punch items on each sheet.
- Drawing markup and commentsArrows, boxes, revision clouds, text, measures and areas to scale, and comments pinned on the drawing that the team replies to and resolves.
- 3D models and BIMIFC, GLB, STL and OBJ models opened in the browser, with sections, measures and comments, and versions and approvals like any document.
- Schedule (Gantt)A Gantt with dependencies, the critical path and a baseline. Change a duration and every date after it moves.
- Every activityEach activity says what it waits for, who does it and where, and its real progress: actual start, actual finish and percent done.
- Look-aheadThe next 2 to 6 weeks for the site meeting: what starts, what is late and who does it, as a PDF or a weekly email.
- DelaysEvery day the system checks the project’s records and suggests delays with their cause; you confirm them and see the days you can claim.
- EquipmentMachines, tools and vehicles: which site each one is on, who has it, the next service and the rentals ending, with QR labels.
- Building assetsLifts, pumps, panels: every asset from purchase to handover, with what is still missing at each stage and a COBie export.
- PlacesThe project’s buildings, floors and rooms, set up once and shared by punch items, checklists, building assets and the schedule.
- Punch items and RFIsNumbered punch items, RFIs and non-conformities with photo, responsible company and due date, pinned on the plan and logged on site even without signal.
- Kinds of card and workflowsRFI, punch item, non-conformity, safety observation: each kind with its own fields, numbering and status flow, drawn as a diagram with who may take each step.
- Inspection checklistsQuality inspections, site safety inspections and material receipt checks from templates, with notes, photos and a PDF ready to sign.
- Site diaryThe daily site report with weather, crew, equipment, work done and photos, crew check-in from the phone, and a closed PDF ready to sign.
- Progress photosFixed photo points shot every week from the phone: slide through the dates of each point or compare two photos side by side.
- Client reportA weekly report that prepares itself with progress, time, photos and the measurement. The client opens it on the phone, asks questions and approves the measurement.
- Handover and owner’s manualEvery unit with its owner and handover date, and an owner’s manual they open from a QR code, with documents, warranties and what to look after.
- Warranty requestsThe owner opens a request from the manual and follows it from a link; your team sees if it is in warranty, which system and which company answers.
See the solution in your company.
Guided demo and commercial terms set per company.

