A Gantt schedule that works out the dates for you.
Build the project’s programme as phases and activities with working-day durations and dependencies. The system works out the dates, the float and the critical path, and compares them with your baseline.
- Critical path in red
- A baseline to compare against
- Edit like a spreadsheet or drag the bars
The problem it solves
On many construction projects the schedule lives in one person’s desktop file. The site works from a printout that is weeks old, nobody sees which activity holds up the finish date, and every change means redrawing bars by hand before the next meeting.
What it does
Critical path in red
The schedule uses the critical path method: change a duration or a dependency and everything after it moves, with the float of each activity and the critical ones in red.
A baseline to compare against
Save a baseline and every bar shows the planned dates underneath. The header shows the start, the finish, the percent done and how many days late or ahead you are.
Edit like a spreadsheet or drag the bars
Type activities straight into the grid, link them by WBS number as in MS Project (2.3SS+2), or drag bars, edges and links on the chart.
Imports MS Project, Primavera P6 and Excel
Bring in an .xml, .xer or .xlsx file with phases, links, progress and the working week. Importing it again updates the same activities, and any import can be undone.
Why it matters
Know what drives the finish date
The critical path shows the activities that push the finish if they slip, so the site meeting starts with the work that matters.
Keep the schedule you already have
Start from your MS Project, Primavera P6 or Excel file, and export back to MS Project or Excel whenever you need to.
One schedule for the office and the site
Everyone on the project opens the same programme, in the project’s calendar and time zone, instead of a printout from last month.
Frequently asked questions
Can I import a schedule from MS Project or Primavera P6?
Yes. Import MS Project (.xml), Primavera P6 (.xer) or Excel (.xlsx). You see what the file brings before importing, importing it again updates the same activities, and Undo import restores the schedule.
Does it calculate the critical path automatically?
Yes. The schedule uses the critical path method: when you change a duration or a dependency, the dates, the float and the critical path are worked out again.
How are holidays and working days handled?
Under Working days you set the working week, the days off and the date progress is recorded up to. Durations count working days, and unfinished work moves after that date.
Tailored plans
Your proposal is built in the demo, based on the size of your operation.
More features of MotionHub Construction
- Every activityEach activity says what it waits for, who does it and where, and its real progress: actual start, actual finish and percent done.
- Look-aheadThe next 2 to 6 weeks for the site meeting: what starts, what is late and who does it, as a PDF or a weekly email.
- DelaysEvery day the system checks the project’s records and suggests delays with their cause; you confirm them and see the days you can claim.
- Projects on a mapEvery project on a map, in cards or in a list, with its status, phase, open tasks and documents waiting for approval.
- Project overviewOne page per project: phases and days left, what needs attention, the site, the client and the team, with every tool of the project one click away.
- Companies and contactsSubcontractors, suppliers, designers, clients and inspectors with their people, invited to each project with or without a licence, or sent documents by transmittal.
- Document registerFolders and versions per project, approval workflows, side-by-side revision comparison and transmittals with a record of who opened what.
- Document approvalsISO 19650 approval workflows and one My approvals queue with every document waiting for you, in every project, one click per step.
- Drawing registerEvery sheet with its number, title, discipline and revision, read from the title blocks of the PDFs, with the open punch items on each sheet.
- Drawing markup and commentsArrows, boxes, revision clouds, text, measures and areas to scale, and comments pinned on the drawing that the team replies to and resolves.
- 3D models and BIMIFC, GLB, STL and OBJ models opened in the browser, with sections, measures and comments, and versions and approvals like any document.
- Budget and cost reportThe budget by cost code, with subcontracts, purchase orders and bills against each line, and the forecast, variance and margin.
- Change ordersEvery change numbered, with its cost, its price to the client and the days it adds; once approved it moves the budget and the contract.
- Progress billingEach month’s measurement starts from the progress recorded on the schedule, with retention, and becomes an invoice with a due date.
- EquipmentMachines, tools and vehicles: which site each one is on, who has it, the next service and the rentals ending, with QR labels.
- Building assetsLifts, pumps, panels: every asset from purchase to handover, with what is still missing at each stage and a COBie export.
- PlacesThe project’s buildings, floors and rooms, set up once and shared by punch items, checklists, building assets and the schedule.
- Punch items and RFIsNumbered punch items, RFIs and non-conformities with photo, responsible company and due date, pinned on the plan and logged on site even without signal.
- Kinds of card and workflowsRFI, punch item, non-conformity, safety observation: each kind with its own fields, numbering and status flow, drawn as a diagram with who may take each step.
- Inspection checklistsQuality inspections, site safety inspections and material receipt checks from templates, with notes, photos and a PDF ready to sign.
- Site diaryThe daily site report with weather, crew, equipment, work done and photos, crew check-in from the phone, and a closed PDF ready to sign.
- Progress photosFixed photo points shot every week from the phone: slide through the dates of each point or compare two photos side by side.
- Client reportA weekly report that prepares itself with progress, time, photos and the measurement. The client opens it on the phone, asks questions and approves the measurement.
- Handover and owner’s manualEvery unit with its owner and handover date, and an owner’s manual they open from a QR code, with documents, warranties and what to look after.
- Warranty requestsThe owner opens a request from the manual and follows it from a link; your team sees if it is in warranty, which system and which company answers.