Progress billing measured from the schedule, with retention.
A measurement is a period’s bill to the client: how much of each contract line was done, the amount, the retention held back and the total to bill. The schedule suggests the percentages.
- Percentages suggested by the schedule
- To date, previous and this period
- Retention held and billed back
The problem it solves
Preparing the monthly bill means walking the site, guessing percentages line by line and rebuilding last month’s spreadsheet. A mistake in the cumulative totals or the retention turns into a dispute with the client and a payment that arrives late.
What it does
Percentages suggested by the schedule
When a contract line is linked to an activity, Use the schedule’s progress fills in its percent done. You only adjust what differs on site.
To date, previous and this period
Enter the percent done to date. The previous measurement is frozen, and this period’s amount is worked out for you against the revised contract.
Retention held and billed back
Set the retention percent on each measurement. The page shows the retention the client holds, and you bill it back when the time comes.
From draft to paid
Approve, mark as billed with a due date and mark as paid when the money arrives. Billed measurements count as money to receive, with overdue ones in red.
Why it matters
Less typing every month
Link budget lines to schedule activities before the first measurement, and the suggested percentages save most of the typing.
Client approval on record
The client approves the measurement from the weekly report link with a code sent to their email, or your team records the approval.
Know what the client owes
Contract, measured, received, to receive and overdue sit at the top of the page, so the open balance is clear at a glance.
Frequently asked questions
How is a measurement calculated?
For each contract line you enter the percent done to date. The system takes off what earlier measurements billed and shows the measured amount, the retention and the amount to bill.
Does progress billing include change orders?
Yes. Percentages apply to the revised contract, the original plus approved change orders, and a measurement still in draft follows a change order approved after it was started.
Can the client approve the measurement online?
Yes. The weekly client report carries the measurement, and the client approves it from the link with a code sent to their email. You see who approved it and when.
Tailored plans
Your proposal is built in the demo, based on the size of your operation.
More features of MotionHub Construction
- Budget and cost reportThe budget by cost code, with subcontracts, purchase orders and bills against each line, and the forecast, variance and margin.
- Change ordersEvery change numbered, with its cost, its price to the client and the days it adds; once approved it moves the budget and the contract.
- Projects on a mapEvery project on a map, in cards or in a list, with its status, phase, open tasks and documents waiting for approval.
- Project overviewOne page per project: phases and days left, what needs attention, the site, the client and the team, with every tool of the project one click away.
- Companies and contactsSubcontractors, suppliers, designers, clients and inspectors with their people, invited to each project with or without a licence, or sent documents by transmittal.
- Document registerFolders and versions per project, approval workflows, side-by-side revision comparison and transmittals with a record of who opened what.
- Document approvalsISO 19650 approval workflows and one My approvals queue with every document waiting for you, in every project, one click per step.
- Drawing registerEvery sheet with its number, title, discipline and revision, read from the title blocks of the PDFs, with the open punch items on each sheet.
- Drawing markup and commentsArrows, boxes, revision clouds, text, measures and areas to scale, and comments pinned on the drawing that the team replies to and resolves.
- 3D models and BIMIFC, GLB, STL and OBJ models opened in the browser, with sections, measures and comments, and versions and approvals like any document.
- Schedule (Gantt)A Gantt with dependencies, the critical path and a baseline. Change a duration and every date after it moves.
- Every activityEach activity says what it waits for, who does it and where, and its real progress: actual start, actual finish and percent done.
- Look-aheadThe next 2 to 6 weeks for the site meeting: what starts, what is late and who does it, as a PDF or a weekly email.
- DelaysEvery day the system checks the project’s records and suggests delays with their cause; you confirm them and see the days you can claim.
- EquipmentMachines, tools and vehicles: which site each one is on, who has it, the next service and the rentals ending, with QR labels.
- Building assetsLifts, pumps, panels: every asset from purchase to handover, with what is still missing at each stage and a COBie export.
- PlacesThe project’s buildings, floors and rooms, set up once and shared by punch items, checklists, building assets and the schedule.
- Punch items and RFIsNumbered punch items, RFIs and non-conformities with photo, responsible company and due date, pinned on the plan and logged on site even without signal.
- Kinds of card and workflowsRFI, punch item, non-conformity, safety observation: each kind with its own fields, numbering and status flow, drawn as a diagram with who may take each step.
- Inspection checklistsQuality inspections, site safety inspections and material receipt checks from templates, with notes, photos and a PDF ready to sign.
- Site diaryThe daily site report with weather, crew, equipment, work done and photos, crew check-in from the phone, and a closed PDF ready to sign.
- Progress photosFixed photo points shot every week from the phone: slide through the dates of each point or compare two photos side by side.
- Client reportA weekly report that prepares itself with progress, time, photos and the measurement. The client opens it on the phone, asks questions and approves the measurement.
- Handover and owner’s manualEvery unit with its owner and handover date, and an owner’s manual they open from a QR code, with documents, warranties and what to look after.
- Warranty requestsThe owner opens a request from the manual and follows it from a link; your team sees if it is in warranty, which system and which company answers.
See the solution in your company.
Guided demo and commercial terms set per company.