MotionHub Construction

Every document waiting for your approval, in one queue.

My approvals lists every document waiting at a step you can move it out of, in every project you can see, grouped by project and folder. Each row has one button per next step, so a review takes one click.

  • One queue for every project
  • One click per step
  • A morning email
My approvals page with 26 documents waiting across five projects, each with its current step and buttons for the next one

The problem it solves

Approvals get lost in inboxes. The architect waits for the engineer, the engineer did not see the email, and the site keeps asking whether the drawing is approved. Reviewers have to dig through every project to find what is waiting for them.

What it does

One queue for every project

Every document waiting for you, grouped by project and folder, with the same count as the Awaiting my approval tile on the projects page and on each project.

One click per step

Open the document to read, comment and mark it up, then click the next step, for example Approved or Revise and resubmit.

A morning email

At 7:30, Monday to Saturday in the project's time, everyone with documents waiting gets one email listing them. People with nothing waiting get no email.

Workflows you can draw

Start from the drawing review or the ISO 19650 document approval flow, or draw your own steps on a diagram, with approvers per step, including an outside company.

Why it matters

Each approver sees what waits for them

In one place, on the web, in the app and in the morning email, with no need to open every project to look for documents.

The approved revision is protected

Moving a file out of an approved step asks first, because the file then stops being the approved revision.

Outside approvers in the same flow

A step can name an outside company, such as the architect, as the approver. They review in the same viewer, with no attachments going back and forth.

Frequently asked questions

What is the My approvals queue?

A page listing every document waiting at a workflow step you can move it out of, in every project you can see, with one button per next step.

Which approval steps come ready?

A drawing review flow (submitted, under review, approved, approved as noted, revise and resubmit) and an ISO 19650 document approval flow. Both can be changed.

Can the morning approvals email be switched off?

Yes. Edit it or switch it off under Notifications, Projects, Morning approvals email. It only goes to people with documents waiting for them.

Tailored plans

Your proposal is built in the demo, based on the size of your operation.

More features of MotionHub Construction

See the solution in your company.

Guided demo and commercial terms set per company.

Book a demo