Every activity: what it waits for, who does it and how far it is.
Open any activity of the schedule to set what it waits for, which company and person carry it out, in which place, and how much is done. The schedule recalculates from there.
- Four kinds of dependency, with lag
- As soon as possible, or from a date
- Company, person in charge and place
The problem it solves
A bar on a chart does not tell the site who is responsible, what has to finish first or whether the work really started. Those answers end up in emails and notebooks, and the schedule drifts away from what is happening on the construction site.
What it does
Four kinds of dependency, with lag
After it finishes, when it starts, finishes with it or finishes when it starts, each with a lag in days, typed in the grid or drawn from one bar to another.
As soon as possible, or from a date
An activity starts as soon as its links allow, not before a date or on a fixed date. Its scheduled dates, float and baseline show right next to it.
Company, person in charge and place
Pick the subcontractor and the person responsible, and the building, floor or room where the work happens, from the project’s list of places.
Real progress and linked punch items
Record the percent done, the actual start and the actual finish. Open tasks linked to the activity show as a badge, so you see what is holding it up.
Why it matters
Every subcontractor knows what is theirs
Filter the schedule by company to see what one subcontractor must deliver, and when, before you pick up the phone.
Progress you can rely on
Actual dates and percent done are recorded from the site, and an activity that has actually started can no longer be dragged by mistake.
Delays shown on the activity
Confirmed delays show as a badge on the activity they held up, and its details list each one with its cause, dates and days lost.
Frequently asked questions
Which dependency types does the schedule support?
Finish-to-start, start-to-start, finish-to-finish and start-to-finish, each with a lag in days. In the grid you can type them by WBS number, as in MS Project: 2.1; 2.3SS+2.
Can the team record progress from the site?
Yes. On the phone, the look-ahead lets people allowed to edit the schedule mark an activity started today, set its percent done or mark it finished today.
What is the difference between an activity, a milestone and a phase?
An activity has a duration in working days, a milestone is a zero-day point such as Roof finished, and a phase groups the activities under it with its own dates.
Tailored plans
Your proposal is built in the demo, based on the size of your operation.
More features of MotionHub Construction
- Schedule (Gantt)A Gantt with dependencies, the critical path and a baseline. Change a duration and every date after it moves.
- Look-aheadThe next 2 to 6 weeks for the site meeting: what starts, what is late and who does it, as a PDF or a weekly email.
- DelaysEvery day the system checks the project’s records and suggests delays with their cause; you confirm them and see the days you can claim.
- Projects on a mapEvery project on a map, in cards or in a list, with its status, phase, open tasks and documents waiting for approval.
- Project overviewOne page per project: phases and days left, what needs attention, the site, the client and the team, with every tool of the project one click away.
- Companies and contactsSubcontractors, suppliers, designers, clients and inspectors with their people, invited to each project with or without a licence, or sent documents by transmittal.
- Document registerFolders and versions per project, approval workflows, side-by-side revision comparison and transmittals with a record of who opened what.
- Document approvalsISO 19650 approval workflows and one My approvals queue with every document waiting for you, in every project, one click per step.
- Drawing registerEvery sheet with its number, title, discipline and revision, read from the title blocks of the PDFs, with the open punch items on each sheet.
- Drawing markup and commentsArrows, boxes, revision clouds, text, measures and areas to scale, and comments pinned on the drawing that the team replies to and resolves.
- 3D models and BIMIFC, GLB, STL and OBJ models opened in the browser, with sections, measures and comments, and versions and approvals like any document.
- Budget and cost reportThe budget by cost code, with subcontracts, purchase orders and bills against each line, and the forecast, variance and margin.
- Change ordersEvery change numbered, with its cost, its price to the client and the days it adds; once approved it moves the budget and the contract.
- Progress billingEach month’s measurement starts from the progress recorded on the schedule, with retention, and becomes an invoice with a due date.
- EquipmentMachines, tools and vehicles: which site each one is on, who has it, the next service and the rentals ending, with QR labels.
- Building assetsLifts, pumps, panels: every asset from purchase to handover, with what is still missing at each stage and a COBie export.
- PlacesThe project’s buildings, floors and rooms, set up once and shared by punch items, checklists, building assets and the schedule.
- Punch items and RFIsNumbered punch items, RFIs and non-conformities with photo, responsible company and due date, pinned on the plan and logged on site even without signal.
- Kinds of card and workflowsRFI, punch item, non-conformity, safety observation: each kind with its own fields, numbering and status flow, drawn as a diagram with who may take each step.
- Inspection checklistsQuality inspections, site safety inspections and material receipt checks from templates, with notes, photos and a PDF ready to sign.
- Site diaryThe daily site report with weather, crew, equipment, work done and photos, crew check-in from the phone, and a closed PDF ready to sign.
- Progress photosFixed photo points shot every week from the phone: slide through the dates of each point or compare two photos side by side.
- Client reportA weekly report that prepares itself with progress, time, photos and the measurement. The client opens it on the phone, asks questions and approves the measurement.
- Handover and owner’s manualEvery unit with its owner and handover date, and an owner’s manual they open from a QR code, with documents, warranties and what to look after.
- Warranty requestsThe owner opens a request from the manual and follows it from a link; your team sees if it is in warranty, which system and which company answers.