Every punch item and RFI numbered, owned and pinned on the plan

Log punch items, RFIs, non-conformities and safety observations with a photo, a place, a responsible company and a due date. Each one gets its number and follows its own steps until your team closes it.

  • Numbered by kind on every project
  • Logged on site, even without signal
  • Pinned on the drawing
Project task board with numbered punch items, RFIs, non-conformities and safety observations, and the bar to download the register as a PDF

The problem it solves

On many sites the punch list lives in a notebook, the RFIs in email threads and the photos on someone’s phone. Nobody can see which items are late, the subcontractor says it was fixed, and every week someone rebuilds the register by hand for the client.

What it does

Numbered by kind on every project

Punch items, RFIs, non-conformities, safety observations and submittals each have their own numbering per project, so PND-012 or RFI-004 reads the same on the list, the board, the drawing and in emails.

Logged on site, even without signal

On the punch walk the app opens the camera: one photo, one spoken or typed line, the place and who fixes it. Without signal, items wait on the phone and go up when the connection comes back.

Pinned on the drawing

Click the spot on a sheet to create a punch item right there. Open items move onto the next revision of the drawing, and the pin turns green once the item is closed.

Registers as PDF or by scheduled email

Pick a kind and open or all items, then download the register as a PDF with totals, fields and up to three photos per item, or email it on a schedule, such as the open punch list every Monday.

Why it matters

The subcontractor fixes, you verify

A punch item goes from open to fixed to verified: the responsible company marks it fixed and your team verifies it or sends it back. Closing it is up to your team.

What is late, on every project

Tasks across projects shows what is open, overdue, due this week and awaiting verification on every project you are on, with one bar per project showing where attention is needed.

A register ready to hand over

Give a subcontractor, the client or an inspector the current register without retyping anything: the PDF is built from the cards as they stand today.

Frequently asked questions

Can subcontractors update their own punch items?

Yes. Name the responsible company on the item and its people see it and act on it: they answer, send photos and mark it fixed. Your team verifies and closes it.

Does the punch list work without internet on site?

The punch walk in the app does: items wait on the phone and go up when the connection comes back. The other screens need a connection.

Can I send the RFI log to the client every week?

Yes. Pick RFIs in the report bar and use Automate this report to email the register on a schedule, or download the PDF whenever you need it.

Tailored plans

Your proposal is built in the demo, based on the size of your operation.

More features of MotionHub Construction

See the solution in your company.

Guided demo and commercial terms set per company.

Book a demo