
The right revision of every document, for everyone on the project.
Each project has its own document register: drawings by discipline, contracts, permits, reports, photos, quality and safety, and the client's folder. Every file keeps its versions, and folders can follow an approval workflow.
- Every version kept
- Approval workflows per folder
- Compare two revisions
The problem it solves
Drawings go out by email, get printed and forwarded, and soon the site is building from a superseded revision. Nobody can say for sure which version is approved, who received it, or whether the subcontractor ever opened it.
What it does
Every version kept
Upload a new revision with the same file name and it becomes v2, v3. The version history keeps every earlier one.
Approval workflows per folder
A drawing review flow and an ISO 19650 document approval flow come ready. Each file shows its step as a coloured chip, and steps can have their own approvers.
Compare two revisions
Open the version history and compare two revisions side by side or with a slider. On a drawing, the Assistant can list what changed, read from the PDF's text.
Transmittals with a record
Select documents and send them to the project's outside contacts. Each gets a personal link and an email code, and the register keeps who opened and downloaded what.
Why it matters
The site works from the approved revision
Everyone can see which revision is approved for construction, and open punch items move to the new revision, so the pins stay on the current sheet.
Folders closed by default
Give access per folder to a person, an outside company or a project group: send only, view, view and download, or send and edit.
A record of what was sent
Each transmittal is numbered in the project's register with the revision it carried, its purpose and whether a response is due.
Frequently asked questions
Does the approval workflow follow ISO 19650?
The Document approval workflow follows the ISO 19650 states: work in progress, shared, published and archived. You can also design your own steps and approvers.
Can someone else open a forwarded transmittal link?
No. Opening it asks for a code sent to the recipient's email, so a forwarded link opens nothing. The link lasts the number of days you choose, from 7 to 90.
Which files can the register hold?
Drawings, contracts, reports and photos. PDFs open with markup and revision comparison, IFC, GLB, STL and OBJ models open in 3D, and DWG or RVT files keep versions and approvals and are downloaded to open.
Tailored plans
Your proposal is built in the demo, based on the size of your operation.
More features of MotionHub Construction
- Document approvalsISO 19650 approval workflows and one My approvals queue with every document waiting for you, in every project, one click per step.
- Projects on a mapEvery project on a map, in cards or in a list, with its status, phase, open tasks and documents waiting for approval.
- Project overviewOne page per project: phases and days left, what needs attention, the site, the client and the team, with every tool of the project one click away.
- Companies and contactsSubcontractors, suppliers, designers, clients and inspectors with their people, invited to each project with or without a licence, or sent documents by transmittal.
- Drawing registerEvery sheet with its number, title, discipline and revision, read from the title blocks of the PDFs, with the open punch items on each sheet.
- Drawing markup and commentsArrows, boxes, revision clouds, text, measures and areas to scale, and comments pinned on the drawing that the team replies to and resolves.
- 3D models and BIMIFC, GLB, STL and OBJ models opened in the browser, with sections, measures and comments, and versions and approvals like any document.
- Schedule (Gantt)A Gantt with dependencies, the critical path and a baseline. Change a duration and every date after it moves.
- Every activityEach activity says what it waits for, who does it and where, and its real progress: actual start, actual finish and percent done.
- Look-aheadThe next 2 to 6 weeks for the site meeting: what starts, what is late and who does it, as a PDF or a weekly email.
- DelaysEvery day the system checks the project’s records and suggests delays with their cause; you confirm them and see the days you can claim.
- Budget and cost reportThe budget by cost code, with subcontracts, purchase orders and bills against each line, and the forecast, variance and margin.
- Change ordersEvery change numbered, with its cost, its price to the client and the days it adds; once approved it moves the budget and the contract.
- Progress billingEach month’s measurement starts from the progress recorded on the schedule, with retention, and becomes an invoice with a due date.
- EquipmentMachines, tools and vehicles: which site each one is on, who has it, the next service and the rentals ending, with QR labels.
- Building assetsLifts, pumps, panels: every asset from purchase to handover, with what is still missing at each stage and a COBie export.
- PlacesThe project’s buildings, floors and rooms, set up once and shared by punch items, checklists, building assets and the schedule.
- Punch items and RFIsNumbered punch items, RFIs and non-conformities with photo, responsible company and due date, pinned on the plan and logged on site even without signal.
- Kinds of card and workflowsRFI, punch item, non-conformity, safety observation: each kind with its own fields, numbering and status flow, drawn as a diagram with who may take each step.
- Inspection checklistsQuality inspections, site safety inspections and material receipt checks from templates, with notes, photos and a PDF ready to sign.
- Site diaryThe daily site report with weather, crew, equipment, work done and photos, crew check-in from the phone, and a closed PDF ready to sign.
- Progress photosFixed photo points shot every week from the phone: slide through the dates of each point or compare two photos side by side.
- Client reportA weekly report that prepares itself with progress, time, photos and the measurement. The client opens it on the phone, asks questions and approves the measurement.
- Handover and owner’s manualEvery unit with its owner and handover date, and an owner’s manual they open from a QR code, with documents, warranties and what to look after.
- Warranty requestsThe owner opens a request from the manual and follows it from a link; your team sees if it is in warranty, which system and which company answers.
See the solution in your company.
Guided demo and commercial terms set per company.

