The weekly client report that prepares itself
Every week a draft is ready with the progress, the time, the photos and the measurement. You review it and send it; the client opens it on the phone, asks questions and approves the measurement.
- A draft ready every week
- Plain words, in the client’s language
- Sent by email, WhatsApp or a link
The problem it solves
A weekly update means copying figures from the schedule, digging photos out of phones and chasing the client for approvals by email. It takes hours, so it is often skipped, and the client hears about a delay only once it has happened.
What it does
A draft ready every week
On the weekday you choose, a draft for the last seven days is composed from the schedule, the site diary and the photos, and the project managers are told it is ready to review.
Plain words, in the client’s language
Progress against the plan, days worked and lost to rain, what finished, what waits on the client and the next two weeks, in the language you pick. Edit the text and choose the photos.
Sent by email, WhatsApp or a link
Preview it as the client will see it on a phone or a computer, then send it by email, by WhatsApp from your phone or as a link. The client opens it without an account.
Approval with an emailed code
The client approves the measurement, approves or declines a change to the contract, or asks a question. An approval needs a 6-digit code sent to their email, and every answer is recorded.
Why it matters
See when the client opened it
The report shows when it was sent, how often it was opened and what the client answered, and you are told when the client first opens it, approves something or asks a question.
Only what the client should see
Private cards, the diary’s occurrences and your own costs stay out of the report. The money section shows the contract side only, and only when the project includes it.
What was sent stays as sent
A sent report is kept as the client saw it. Send it again, duplicate it as a new draft, or withdraw the link so it stops working.
Frequently asked questions
Does the client need an account to see the report?
No. The client opens the report from a link, on the phone or the computer, and can download it as a PDF. Approving the measurement needs a code sent to their email.
Is the weekly report sent automatically?
No. A draft is prepared on the project’s weekday and the managers are told it is ready. A person decides when to send it, after reviewing it.
Can the client approve the measurement from the report?
Yes. Attach the measurement to the report and the client approves it from the link, confirming with a 6-digit code sent to their email. You see who approved it and when.
Tailored plans
Your proposal is built in the demo, based on the size of your operation.
More features of MotionHub Construction
- Handover and owner’s manualEvery unit with its owner and handover date, and an owner’s manual they open from a QR code, with documents, warranties and what to look after.
- Warranty requestsThe owner opens a request from the manual and follows it from a link; your team sees if it is in warranty, which system and which company answers.
- Projects on a mapEvery project on a map, in cards or in a list, with its status, phase, open tasks and documents waiting for approval.
- Project overviewOne page per project: phases and days left, what needs attention, the site, the client and the team, with every tool of the project one click away.
- Companies and contactsSubcontractors, suppliers, designers, clients and inspectors with their people, invited to each project with or without a licence, or sent documents by transmittal.
- Document registerFolders and versions per project, approval workflows, side-by-side revision comparison and transmittals with a record of who opened what.
- Document approvalsISO 19650 approval workflows and one My approvals queue with every document waiting for you, in every project, one click per step.
- Drawing registerEvery sheet with its number, title, discipline and revision, read from the title blocks of the PDFs, with the open punch items on each sheet.
- Drawing markup and commentsArrows, boxes, revision clouds, text, measures and areas to scale, and comments pinned on the drawing that the team replies to and resolves.
- 3D models and BIMIFC, GLB, STL and OBJ models opened in the browser, with sections, measures and comments, and versions and approvals like any document.
- Schedule (Gantt)A Gantt with dependencies, the critical path and a baseline. Change a duration and every date after it moves.
- Every activityEach activity says what it waits for, who does it and where, and its real progress: actual start, actual finish and percent done.
- Look-aheadThe next 2 to 6 weeks for the site meeting: what starts, what is late and who does it, as a PDF or a weekly email.
- DelaysEvery day the system checks the project’s records and suggests delays with their cause; you confirm them and see the days you can claim.
- Budget and cost reportThe budget by cost code, with subcontracts, purchase orders and bills against each line, and the forecast, variance and margin.
- Change ordersEvery change numbered, with its cost, its price to the client and the days it adds; once approved it moves the budget and the contract.
- Progress billingEach month’s measurement starts from the progress recorded on the schedule, with retention, and becomes an invoice with a due date.
- EquipmentMachines, tools and vehicles: which site each one is on, who has it, the next service and the rentals ending, with QR labels.
- Building assetsLifts, pumps, panels: every asset from purchase to handover, with what is still missing at each stage and a COBie export.
- PlacesThe project’s buildings, floors and rooms, set up once and shared by punch items, checklists, building assets and the schedule.
- Punch items and RFIsNumbered punch items, RFIs and non-conformities with photo, responsible company and due date, pinned on the plan and logged on site even without signal.
- Kinds of card and workflowsRFI, punch item, non-conformity, safety observation: each kind with its own fields, numbering and status flow, drawn as a diagram with who may take each step.
- Inspection checklistsQuality inspections, site safety inspections and material receipt checks from templates, with notes, photos and a PDF ready to sign.
- Site diaryThe daily site report with weather, crew, equipment, work done and photos, crew check-in from the phone, and a closed PDF ready to sign.
- Progress photosFixed photo points shot every week from the phone: slide through the dates of each point or compare two photos side by side.