Change orders with cost, price and days, approved before they count.
Record every change to the scope as a numbered change order with its lines, cost, price and schedule days. Send it to the client, and once it is approved the budget and the contract are updated.
- Numbered, with a reason
- Cost and price on every line
- Schedule impact in working days
The problem it solves
Extra work agreed on site often gets done before anyone prices it. Weeks later the client disputes the amount, the budget no longer matches the contract, and the days the change added are missing from the schedule.
What it does
Numbered, with a reason
Each change order gets the next number (CO-001), a title, a date and a reason: client request, design change, site condition, error or omission. Link the RFI that caused it.
Cost and price on every line
Add more or less of an existing budget line, with a negative quantity to take work out, or a new line with its cost code. Your cost and the client’s price stay apart.
Schedule impact in working days
Say how many working days the change adds or takes away. Approved changes that add days are suggested as delays, with the cause taken from the reason.
A PDF for the client to sign
The PDF shows the lines with prices only, the contract before the change, this change, the revised contract, the time impact and signature lines.
Why it matters
The original budget stays as signed
Changes are kept as differences, so you see the original budget, the approved changes and the revised totals side by side.
Pending changes in plain sight
Drafts and orders sent to the client show as pending, with their cost, until they are approved or rejected.
The client answers from the weekly report
Change orders sent to the client appear in the weekly client report, where the client approves or declines them with a code sent to their email.
Frequently asked questions
How does a change order update the budget and the contract?
Only an approved change order counts. Approving it adds its new lines to the budget and moves the revised budget and contract, and a draft measurement follows the revised contract.
Can the client approve a change order online?
Yes. A change order marked as sent appears in the weekly client report, where the client approves or declines it with a code sent to their email. Your team still gives the final approval.
Can an approved change order be undone?
It can go back to draft while nothing depends on it. Once a commitment, a bill or an approved measurement relies on it, the system refuses, so the records stay consistent.
Tailored plans
Your proposal is built in the demo, based on the size of your operation.
More features of MotionHub Construction
- Budget and cost reportThe budget by cost code, with subcontracts, purchase orders and bills against each line, and the forecast, variance and margin.
- Progress billingEach month’s measurement starts from the progress recorded on the schedule, with retention, and becomes an invoice with a due date.
- Projects on a mapEvery project on a map, in cards or in a list, with its status, phase, open tasks and documents waiting for approval.
- Project overviewOne page per project: phases and days left, what needs attention, the site, the client and the team, with every tool of the project one click away.
- Companies and contactsSubcontractors, suppliers, designers, clients and inspectors with their people, invited to each project with or without a licence, or sent documents by transmittal.
- Document registerFolders and versions per project, approval workflows, side-by-side revision comparison and transmittals with a record of who opened what.
- Document approvalsISO 19650 approval workflows and one My approvals queue with every document waiting for you, in every project, one click per step.
- Drawing registerEvery sheet with its number, title, discipline and revision, read from the title blocks of the PDFs, with the open punch items on each sheet.
- Drawing markup and commentsArrows, boxes, revision clouds, text, measures and areas to scale, and comments pinned on the drawing that the team replies to and resolves.
- 3D models and BIMIFC, GLB, STL and OBJ models opened in the browser, with sections, measures and comments, and versions and approvals like any document.
- Schedule (Gantt)A Gantt with dependencies, the critical path and a baseline. Change a duration and every date after it moves.
- Every activityEach activity says what it waits for, who does it and where, and its real progress: actual start, actual finish and percent done.
- Look-aheadThe next 2 to 6 weeks for the site meeting: what starts, what is late and who does it, as a PDF or a weekly email.
- DelaysEvery day the system checks the project’s records and suggests delays with their cause; you confirm them and see the days you can claim.
- EquipmentMachines, tools and vehicles: which site each one is on, who has it, the next service and the rentals ending, with QR labels.
- Building assetsLifts, pumps, panels: every asset from purchase to handover, with what is still missing at each stage and a COBie export.
- PlacesThe project’s buildings, floors and rooms, set up once and shared by punch items, checklists, building assets and the schedule.
- Punch items and RFIsNumbered punch items, RFIs and non-conformities with photo, responsible company and due date, pinned on the plan and logged on site even without signal.
- Kinds of card and workflowsRFI, punch item, non-conformity, safety observation: each kind with its own fields, numbering and status flow, drawn as a diagram with who may take each step.
- Inspection checklistsQuality inspections, site safety inspections and material receipt checks from templates, with notes, photos and a PDF ready to sign.
- Site diaryThe daily site report with weather, crew, equipment, work done and photos, crew check-in from the phone, and a closed PDF ready to sign.
- Progress photosFixed photo points shot every week from the phone: slide through the dates of each point or compare two photos side by side.
- Client reportA weekly report that prepares itself with progress, time, photos and the measurement. The client opens it on the phone, asks questions and approves the measurement.
- Handover and owner’s manualEvery unit with its owner and handover date, and an owner’s manual they open from a QR code, with documents, warranties and what to look after.
- Warranty requestsThe owner opens a request from the manual and follows it from a link; your team sees if it is in warranty, which system and which company answers.