Each project's progress, what is late and what waits for you, on one page.
Open a project and its overview shows the phase, the dates and days left, the late items and the documents waiting for your approval. The left menu becomes the project's menu, with documents, drawings, tasks, schedule and budget.
- Phases, dates and days left
- Needs attention
- Site, client and team
The problem it solves
On many projects, the status lives in someone's head. To know what is late or what still waits for approval, you open the task list, the documents and your email, then call the site. Switching to another project means starting over.
What it does
Phases, dates and days left
See where the project stands, from planning and earthworks to finishing and handover, with the start, the planned end and the days left. Click a phase to set it.
Needs attention
Tasks that are late or due this week and documents waiting for your approval, in one panel. When nothing is pending, it says the project is on track.
Site, client and team
The address on a map with the site's time zone, the client company and its contact, and the faces of the team. The plus button adds people.
Every tool one click away
Documents, drawings, tasks, checklists, site diary, schedule, budget and assets sit in the project's menu. Switch projects and stay on the same tool.
Why it matters
A quick daily check
Needs attention lists overdue items first, then what waits for your approval, so the day's priorities are there as soon as you open the project.
Links that land in the right place
Each tool has its own address, so you can bookmark a project's schedule or send a colleague the link to its drawings.
On the phone too
On a phone, the project's tools appear as a row of tabs under the header, with the same information as on the computer.
Frequently asked questions
What does the project overview show?
The phases with the start, planned end and days left, open and overdue tasks, documents awaiting approval, what needs attention this week, and the site, client and team.
Can I jump from one project to another without losing my place?
Yes. Click the project's name at the top of the menu and pick another one. You stay on the same tool, for example from one project's schedule to the next one's.
Who can see a project?
The people on its team. Managers who follow the whole portfolio get the permission to see all projects, and everyone sees only the tools their permissions allow.
Tailored plans
Your proposal is built in the demo, based on the size of your operation.
More features of MotionHub Construction
- Projects on a mapEvery project on a map, in cards or in a list, with its status, phase, open tasks and documents waiting for approval.
- Companies and contactsSubcontractors, suppliers, designers, clients and inspectors with their people, invited to each project with or without a licence, or sent documents by transmittal.
- Document registerFolders and versions per project, approval workflows, side-by-side revision comparison and transmittals with a record of who opened what.
- Document approvalsISO 19650 approval workflows and one My approvals queue with every document waiting for you, in every project, one click per step.
- Drawing registerEvery sheet with its number, title, discipline and revision, read from the title blocks of the PDFs, with the open punch items on each sheet.
- Drawing markup and commentsArrows, boxes, revision clouds, text, measures and areas to scale, and comments pinned on the drawing that the team replies to and resolves.
- 3D models and BIMIFC, GLB, STL and OBJ models opened in the browser, with sections, measures and comments, and versions and approvals like any document.
- Schedule (Gantt)A Gantt with dependencies, the critical path and a baseline. Change a duration and every date after it moves.
- Every activityEach activity says what it waits for, who does it and where, and its real progress: actual start, actual finish and percent done.
- Look-aheadThe next 2 to 6 weeks for the site meeting: what starts, what is late and who does it, as a PDF or a weekly email.
- DelaysEvery day the system checks the project’s records and suggests delays with their cause; you confirm them and see the days you can claim.
- Budget and cost reportThe budget by cost code, with subcontracts, purchase orders and bills against each line, and the forecast, variance and margin.
- Change ordersEvery change numbered, with its cost, its price to the client and the days it adds; once approved it moves the budget and the contract.
- Progress billingEach month’s measurement starts from the progress recorded on the schedule, with retention, and becomes an invoice with a due date.
- EquipmentMachines, tools and vehicles: which site each one is on, who has it, the next service and the rentals ending, with QR labels.
- Building assetsLifts, pumps, panels: every asset from purchase to handover, with what is still missing at each stage and a COBie export.
- PlacesThe project’s buildings, floors and rooms, set up once and shared by punch items, checklists, building assets and the schedule.
- Punch items and RFIsNumbered punch items, RFIs and non-conformities with photo, responsible company and due date, pinned on the plan and logged on site even without signal.
- Kinds of card and workflowsRFI, punch item, non-conformity, safety observation: each kind with its own fields, numbering and status flow, drawn as a diagram with who may take each step.
- Inspection checklistsQuality inspections, site safety inspections and material receipt checks from templates, with notes, photos and a PDF ready to sign.
- Site diaryThe daily site report with weather, crew, equipment, work done and photos, crew check-in from the phone, and a closed PDF ready to sign.
- Progress photosFixed photo points shot every week from the phone: slide through the dates of each point or compare two photos side by side.
- Client reportA weekly report that prepares itself with progress, time, photos and the measurement. The client opens it on the phone, asks questions and approves the measurement.
- Handover and owner’s manualEvery unit with its owner and handover date, and an owner’s manual they open from a QR code, with documents, warranties and what to look after.
- Warranty requestsThe owner opens a request from the manual and follows it from a link; your team sees if it is in warranty, which system and which company answers.
See the solution in your company.